Heating and Cooling Curve

Heating and cooling specifications

As a rule: the slower, the better!

Attention: If you have any questions, please contact us before commissioning or decommissioning. Before initial commissioning, a setting time of at least 24 hours after refractory lining must be observed. The following temperature curve must be observed during initial commissioning.

Commissioning

During commissioning, the heating rate must not exceed 10 °C per hour up to 200 °C and 50 °C per hour above 200 °C (see curve).

Decommissioning

During decommissioning, the cooling rate must not exceed 50 °C per hour down to 200 °C and 10 °C per hour below 200 °C (see curve).

Graph showing heating and cooling times for waste incineration plants at 900 °C and 1,100 °C